Construction Loan Guides & Resources
Free educational resources to help you understand construction financing and plan your dream home build.
20-25%
Typical Down Payment
of total project cost
6-18 months
Construction Period
depending on project size
Interest-only
Interest Type
on funds drawn
4-6 draws
Draw Inspections
typical schedule
Ready to calculate your loan?
Use our free construction loan calculator to estimate your costs.
Construction Loan Down Payments
Understand how much you need to put down for a construction loan. Learn about conventional, FHA, VA, and USDA options.
- Conventional loans: 20-25%
- FHA loans: As low as 3.5%
- VA loans: 0% for veterans
- Using land equity
Land Loans Explained
Everything you need to know about financing your land purchase before building your home.
- Raw land vs improved land
- Lot loan requirements
- Interest rates
- Combining with construction
How to Finance Your Build
A complete guide to understanding construction loan options and getting approved.
- Pre-approval process
- Required documents
- Builder requirements
- Timeline expectations
Budgeting for Your Custom Home
Learn how to create a realistic budget for your new custom home build.
- Cost breakdown
- Contingency planning
- Hidden costs
- Cost per square foot
Pros & Cons of Construction Loans
Understand the advantages and disadvantages of construction financing for renovations.
- When to use
- Interest-only payments
- Draw schedules
- Conversion options
Buying Land in California
Step-by-step guide to purchasing land for building a custom home in California.
- Zoning research
- Due diligence
- Site assessment
- Closing process
What Is a Construction Loan?
Your Project Planning Hub — everything you need to know before breaking ground.
A construction loan is a short-term, higher-interest loan that provides funds to build a residential property. Unlike a traditional mortgage where the bank hands you a lump sum, construction loans are disbursed in increments called “draws” as construction milestones are completed and inspected. You only pay interest on the funds that have been drawn — which means your monthly payments start small and grow as the project progresses.
Construction-to-Permanent vs. Construction-Only
There are two primary types of construction loans, and the choice between them affects your closing costs, flexibility, and long-term rate:
Construction-to-Permanent (One-Time Close)
- • Single closing — one set of closing costs
- • Automatically rolls into a 30-year fixed mortgage
- • Rate is locked at the start — protects against rising rates
- • Best for: Borrowers who want simplicity and rate certainty
Construction-Only (Two-Close)
- • Two separate closings — construction loan + permanent mortgage
- • Higher total fees, but more flexibility on permanent terms
- • You can shop for the best permanent rate after the build
- • Best for: Borrowers who want flexibility or expect rates to drop
Most first-time builders opt for a construction-to-permanent loan because it reduces paperwork and locks in the rate. Our construction loan calculator models both the interest-only construction phase and the permanent mortgage conversion so you can plan the full journey.
The “Money Puzzle”: How Draw Schedules Work
The bank doesn't hand over a check on day one. Instead, construction loans are paid out in “draws” — scheduled disbursements tied to completed milestones. An inspector verifies each milestone before the next draw is released. A typical draw schedule looks like this:
| Milestone | % Drawn | What Happens |
|---|---|---|
| Grading | 5% | Site preparation, utility rough-in |
| Foundation | 15% | Concrete poured and cured |
| Framing | 30% | Walls, roof structure, windows |
| Rough-ins | 50% | Plumbing, electrical, HVAC |
| Drywall | 70% | Interior walls, insulation |
| Finishes | 85% | Cabinets, flooring, fixtures |
| Completion | 100% | Final walkthrough, Certificate of Occupancy |
During the interest-only period, you only pay interest on the outstanding balance at each stage. That's why your monthly payment during framing (30% drawn) is much lower than at completion (100% drawn). Use our calculator to see exactly how this affects your monthly costs.
Soft Costs: The Money You Spend Before Breaking Ground
Most first-time builders are surprised to learn that 6–10 months of planning and spending happen before the construction loan even begins. These are called “soft costs” — and they typically account for roughly 8% of your total project budget. Here's how that breaks down:
Architect / Designer
3–5%
of total project budget
Permits & Impact Fees
~3%
of total project budget
Engineering & Reports
~2%
Surveys, soils, grading, civil
These costs are typically paid out-of-pocket during a 6–10 month pre-planning phase — before your construction loan even opens. A good builder will help you map these out so you're not caught off-guard. Our calculator now includes an optional soft cost estimator to help you budget for this phase.
Contingency: Your Safety Buffer
Most lenders require a 5–10% contingency reserve for unforeseen site conditions, material price shifts, or change orders. This isn't extra budget you're hoping to spend — it's a safety net that gives you and your lender confidence that the project can handle surprises. Our calculator lets you toggle a contingency percentage so you can see how it impacts your total loan amount and interest costs.
More Resources from Buildable
Important Disclaimer
The calculations and information provided are for educational and directional purposes only. This is not financial advice. Actual loan terms, rates, and eligibility will vary based on your individual circumstances, credit profile, and lender requirements. Always consult with a licensed mortgage professional or financial advisor before making any financial decisions.